Industrial facility planning scene showing a modern factory layout reviewed for a zoned fire suppression strategy
10 September 2026

One Factory, Multiple Fire Risks: When Does a Zoned Fire Suppression Strategy Make Sense?

A zoned fire suppression strategy can make sense when one industrial site contains different fire hazards that are not well served by a single system type. A factory may combine open production areas, storage, machinery spaces, plant rooms, electrical rooms and specialist process risks. The suppression strategy should match each area to the hazard, fire strategy, water supply, test evidence, insurer expectations and maintenance needs.

NPHS supports industrial and manufacturing projects with water mist, sprinkler and specialist suppression review, installation, commissioning and planned maintenance across the UK.

What is a zoned fire suppression strategy?

A zoned strategy separates an industrial building into areas according to the fire risk and the suppression performance required. The zones may use the same system technology with different design criteria, or they may use different technologies where the risks are materially different.

For example, a large storage area may point towards sprinkler protection, while a machinery enclosure or plant room may justify a water mist or specialist local-application system. The objective is to match the suppression route to the actual hazard rather than treating the whole factory as one identical space.

Industrial Water Mist & Sprinkler Systems

Eight key considerations when planning a zoned fire suppression strategy for an industrial site

Why do factories often contain several different fire risks?

Industrial sites evolve around production. One building can contain raw materials, finished goods, packaging, heat-producing machinery, electrical equipment, fuels, maintenance areas and offices.

Those areas can have different ignition sources, fuel loads, ventilation conditions and business-continuity consequences. A conveyor line carrying combustible material does not present the same design question as a warehouse bay or an electrical control room.

Industrial sites commonly include machinery spaces, plant rooms, control rooms, generator areas, storage zones and mixed-use factory areas. Each should be assessed on its actual hazard and operating conditions rather than assumed to need the same suppression approach.

When is one suppression system across the whole factory still appropriate?

A single technology may be entirely appropriate where the hazard classification, building arrangement and approval route support it across the relevant protected areas.

Sprinklers are a well-established route for many industrial and storage environments. BSI currently lists BS EN 12845:2015+A2:2026 as current for the design, installation and maintenance of fixed sprinkler systems in buildings and industrial plants.

Zoning should address a real difference in hazard, required system performance, installation conditions or operational needs.

Which factory areas often need separate assessment?

The first design step is to break the site down by use. That usually gives a clearer picture than starting with a product choice.

Factory areaPossible suppression routeMain design question
Open production floorSprinklers, water mist or project-specific systemWhat are the fire load, ignition sources and process conditions?
Storage and rackingOften sprinkler-ledWhat is stored, how high, in what packaging and configuration?
Machinery enclosureWater mist or specialist local applicationIs there tested performance for the machinery or hazard?
Plant roomWater mist, sprinklers or specialist suppressionWhat equipment, ventilation and maintenance access exist?
Electrical or control roomSpecialist suppression, water mist or building sprinkler strategyHow sensitive is the equipment and what continuity requirement applies?
Generator or turbine areaWater mist or specialist suppressionWhat fuel, heat release, ventilation and tested application are involved?

How does process risk change the suppression design?

Process risk can be more important than the building label. Two factories of the same size can need very different suppression strategies if one contains mainly assembly operations and the other uses hot work, oils, solvents, combustible dust or high-energy machinery.

The project team should identify normal operating conditions, credible fire scenarios, process shutdown requirements and any materials that make water unsuitable or require additional controls.

A suppression contractor can advise on system options, but the process risk should be defined with the appropriate fire consultant, responsible person, insurer and other specialists where required.

Why are storage areas often treated separately?

Storage is highly sensitive to commodity, packaging, arrangement and height. A change from low-level metal components to high-rack plastics or heavily packaged goods can change the suppression demand considerably.

Factory storage areas often need their own assessment, particularly where commodity type, packaging, racking arrangement or storage height changes the required suppression performance.

Racking changes also matter after handover. If the storage configuration changes, the building team should check whether the installed suppression design still suits the new arrangement.

Where can industrial water mist fit into a zoned strategy?

Water mist can be considered for selected industrial applications where the tested system matches the risk and where factors such as water demand, pipework routes or targeted application make it a suitable option.

The current BS EN 14972-1:2020+A1:2025 standard covers the design, installation, inspection and maintenance of fixed land-based water mist systems. Its scope is tied to applications and occupancies covered by the fire-test protocols in the EN 14972 series.

That matters for industrial projects. A water mist system should not be chosen for a machinery or process hazard simply because mist appears attractive. The tested application and evidence need to match the intended risk.

BS EN 14972 Water Mist Systems

Where do industrial sprinklers fit?

Sprinklers are commonly specified for open production, storage and other industrial areas where the hazard classification and project requirements support a sprinkler-based approach.

BS EN 12845:2015+A2:2026 covers hazard classification, water supplies, components, installation, testing, maintenance and modifications to sprinkler systems in buildings and industrial plants.

The actual design still depends on the site. Water supply, hazard classification, storage arrangements, ceiling geometry and insurer requirements can all affect the final system.

Fire Sprinkler Installation UK

When might specialist suppression be needed instead?

Some industrial risks need a system other than water mist or standard sprinklers.

Electrical equipment, flammable-liquid risks, enclosed machinery and business-critical technical rooms may require specialist suppression or local-application systems, depending on the hazard, process and project requirements.

A zoned strategy allows that specialist protection to sit alongside the wider factory suppression system, provided the interfaces, controls and maintenance responsibilities are clearly defined.

How should different suppression zones interface with the fire alarm and process controls?

Multiple systems create interface questions that need to be resolved at design stage.

The project team may need to coordinate alarm inputs, plant shutdowns, ventilation controls, power isolation, door functions, monitoring and building management system signals.

The cause-and-effect logic should make clear what each system does when it activates, what equipment stops, what alarms are generated and what staff are expected to do.

What should the water-supply strategy consider?

Different zones can place very different demands on the water supply.

Different zones can place very different demands on pumps, tanks and water supplies. Where systems share infrastructure, the design team should confirm that the supply arrangement supports the required operating scenarios and simultaneous demands where relevant.

Plant space, electrical supplies, access and future testing should be considered at the same time.

Do insurer requirements affect zoning?

Industrial insurers can have specific expectations around sprinkler protection, storage hazards, process risks and system resilience.

The insurer should therefore be involved early where its requirements form part of the project brief. A zoned arrangement that appears technically sensible may still need to be reconciled with insurer standards or client risk-engineering requirements.

How does the fire risk assessment fit into the design?

For factories and warehouses in England, the responsible person must carry out and regularly review a fire risk assessment. Home Office guidance for factories and warehouses is published to assist responsible persons in meeting duties under the Regulatory Reform (Fire Safety) Order 2005.

The fire risk assessment identifies hazards, people at risk and required measures. It should inform the wider fire-safety picture, while the suppression design then needs its own technical standards, fire strategy and project-specific evidence.

If the factory process, stock, machinery or layout changes materially, the risk assessment and suppression suitability may both need review.

What information should be agreed before tender?

Tender documents should tell contractors where the main risks are and which system responsibilities have already been decided.

If the project is using multiple suppression zones, bidders need to understand the boundaries between systems, the design standards, water-supply assumptions, interfaces and commissioning responsibilities.

Tender questionWhat should be clear
What risks are being protected?Production, storage, plant, machinery, electrical or specialist areas
Which system applies in each zone?Sprinkler, water mist or specialist suppression
Which standard or evidence route applies?Current standards, tested applications and project-specific requirements
How do the systems interface?Alarms, shutdowns, monitoring and controls
Who provides water and power infrastructure?Tanks, pumps, electrical supplies and plant space
How will systems be commissioned?Zone-by-zone tests, interface checks and records

How should commissioning work on a multi-system industrial site?

Each system should be commissioned against its design and relevant requirements, but the project also needs an integrated view.

Testing should confirm not only that the sprinkler, mist or specialist system operates correctly, but also that the alarm, shutdown and monitoring interfaces behave as intended.

Handover records should identify the protected zones, design basis, system type, test results and maintenance requirements.

Why is long-term maintenance more important when several systems are installed?

A mixed suppression strategy creates more than one service regime.

Sprinklers, water mist and specialist suppression systems can have different inspection schedules, components, test procedures and manufacturer requirements. The maintenance plan should therefore be agreed before handover and linked to the actual zones in the building.

Facilities teams also need a process for reviewing changes. New machinery, relocated racking, altered partitions or process changes can all affect the basis on which the original system was designed.

Fire Suppression System Maintenance

What should you send NPHS for an industrial zoning review?

Send the latest drawings and a description of what happens in each part of the site. The process information is just as useful as the floor plan.

  • Factory layout and ceiling heights
  • Process and machinery descriptions
  • Storage and racking information
  • Fire strategy or fire risk assessment information
  • Water-supply and plant details where known
  • Insurer or consultant requirements

For an existing site, maintenance records, previous drawings and photographs can help identify what is already protected and whether the current use still matches the original design.

Need help planning fire suppression across a mixed-risk industrial site?

NPHS works with manufacturers, factory owners, contractors, consultants and facilities teams on industrial water mist, sprinkler and specialist suppression projects.

We can review the building, process risks and existing systems, then support system selection, installation coordination, commissioning, documentation and long-term maintenance.

Frequently asked questions

What is a zoned fire suppression strategy?

A zoned fire suppression strategy divides a building into areas according to fire risk and suppression requirements. Different zones may use sprinklers, water mist or specialist suppression where the hazards, tested applications or operating requirements differ.

Does every factory need more than one fire suppression system?

No. A single system can be suitable where the risk, building layout and compliance route support it. Multiple systems are useful where materially different process, storage, machinery or technical risks need different suppression performance.

Can water mist and sprinklers be used in the same factory?

Yes, they can be used in different areas where each system is suitable for the relevant risk and the interfaces are properly designed. The project team should coordinate water supplies, alarms, shutdowns, commissioning and maintenance responsibilities.

When should an industrial suppression strategy be reviewed?

Review the strategy when the process, storage, racking, machinery, building layout or fire-safety requirements change materially. Existing suppression can become unsuitable if the hazard changes significantly from the original design basis.

Can NPHS review an existing factory with several fire risks?

Yes. NPHS can review drawings, process information, existing systems, maintenance records and site constraints and advise on sprinkler, water mist or specialist suppression options for different areas.

Need help planning suppression across a mixed-risk industrial site?

NPHS works with manufacturers, factory owners, main contractors, consultants and facilities teams on industrial water mist, sprinkler and specialist suppression projects.

Send us your factory drawings, process information, storage details, fire strategy or existing system records. We can review the main risk zones, likely standards routes, water-supply requirements, interfaces, commissioning needs and long-term maintenance responsibilities.

Send your factory drawings and process details for review

Primary sources

BSI Knowledge: BS EN 14972-1:2020+A1:2025

BSI Knowledge: BS EN 12845:2015+A2:2026

GOV.UK: Fire safety risk assessment: factories and warehouses

Leave a Reply